Gateway Firestop & Sealants

Specialty Subcontractor · Omaha, Nebraska

Firestopping and joint sealant contracting for commercial construction

Gateway Firestop & Sealants installs and repairs penetration and joint firestop systems — CSI sections 07 84 00 and 07 92 00 — for general contractors, trade subcontractors, and building owners across the Omaha metro. Work is installed to tested UL listings and documented at closeout.

Proposals returned within one business day · Repair scopes scheduled within two

Detail 1 / FS-501Through-penetration · rated GWB wall
Typ. through-penetration firestop system Sys: UL W-L-1054 Scale: NTS

The work, defined

What firestopping is, and why it's inspected

Fire-resistance-rated walls and floors divide a building into compartments that contain fire and smoke long enough for occupants to leave and responders to work. Every pipe, conduit, cable, and duct that passes through a rated assembly creates an opening in that compartment — and building codes require each opening to be protected by a firestop system tested for that specific combination of assembly, penetrating item, and sealing materials.

A firestop system is not a product. It is a tested configuration.

Sealant applied outside the parameters of a tested listing — the wrong depth, the wrong annular space, missing backing material — does not carry a rating, regardless of what the sealant tube says. This is the most common reason firestop work fails inspection.

Gateway's scope is limited to this trade. Each condition is matched to a published UL listing before installation; where no listing fits the field condition, an engineering judgment is requested from the system manufacturer rather than improvising a detail.

  • IBC §714Penetrations of fire-resistance-rated walls and horizontal assemblies must be protected by approved penetration firestop systems.
  • IBC §715Joints in and between rated assemblies — including head-of-wall conditions — require tested fire-resistant joint systems.
  • ASTM E814 / UL 1479The fire test standard for through-penetration firestop systems, establishing F (flame) and T (temperature) ratings.
  • IBC §1705Special inspection of firestop systems is required in high-rise buildings and Risk Category III/IV structures, per ASTM E2174 and E2393.
  • CSI 07 84 00 / 07 92 00The MasterFormat specification sections covering firestopping and joint sealants, respectively.

Scope of services

Services

Gateway performs work under direct subcontract to general contractors, as a lower-tier subcontractor to trade contractors whose scopes include firestopping, and directly for building owners and facility managers.

CSI 07 84 00

Firestop installation

Through-penetration and joint firestop systems for commercial new construction and tenant improvement, installed to tested UL listings.

  • Pipe, conduit, cable, and duct penetrations
  • Head-of-wall and construction joints
  • Mixed penetrations and sleeved openings
  • Submittals including system listings

Repair & remediation

Inspection deficiencies

Correction of firestop deficiencies identified by fire marshals, third-party special inspectors, or facility barrier surveys, on occupied or active sites.

  • Condition-by-condition system matching
  • Scheduling coordinated to re-inspection dates
  • Photographic documentation of each repair
  • Small scopes accepted

CSI 07 92 00

Joint sealants

Interior and exterior commercial joint sealants, performed with the same specification discipline applied to rated work.

  • Expansion and control joints
  • Perimeter and frame joints
  • Acoustic and air-barrier sealants
  • Sealant replacement and recaulking

Method

How every scope is closed out

The same four steps apply to a full bid package and a one-day repair scope. The documentation exists because inspectors, special inspectors, and building owners ask for it.

01 — Match

System selection

Each field condition is matched to a published UL listing. Where none applies, an engineering judgment is requested from the manufacturer.

02 — Install

Installation per listing

Materials, depth, annular space, and backing installed as tested — the parameters that make a rating valid.

03 — Label

Identification

A printed label at each penetration records the system number, F-rating, and installation date.

04 — Log

Closeout documentation

Photographs of the labeled installations are compiled into a penetration log and delivered with the completed work.

Project types

Where this work occurs

Commercial

Commercial & tenant improvement

Office, retail, and mixed-use construction, where rated corridor and demising walls are penetrated by every trade on the schedule.

Education

K-12 & higher education

School renovation, much of it performed during summer breaks against fixed reopening dates.

Healthcare

Healthcare & senior living

Hospitals, medical office buildings, and senior living facilities, where barrier integrity is reviewed under accreditation and life-safety surveys.

Mission-critical

Data centers & industrial

Facilities with high-density cable and conduit penetrations, including site badging and orientation requirements.

Reference

Common questions

What is firestopping?
Firestopping is the sealing of openings and joints in fire-resistance-rated walls and floors so fire and smoke cannot pass between building compartments. The International Building Code requires penetrations of rated assemblies to be protected by systems tested to ASTM E814 / UL 1479 and installed in accordance with the tested listing. In specifications, the work falls under CSI section 07 84 00; related joint sealants fall under 07 92 00.
Who performs firestop work in Omaha?
Gateway Firestop & Sealants is a specialty subcontractor based in Omaha whose scope is limited to firestopping and joint sealants. The firm installs firestop systems on commercial projects, corrects deficiencies identified during inspections, and provides labeled, photo-documented closeout records. The service area covers the Omaha metro, Sarpy and Douglas Counties, and Council Bluffs.
How is firestop work priced?
From the actual scope: the number and type of penetrations, the assemblies involved, and access conditions. Proposals are prepared from a drawing takeoff or a site walk and itemize the UL system applied to each condition — the price and the scope are visible line by line. Proposals are typically returned within one business day.
What documentation is provided?
Each sealed penetration receives a printed identification label showing the UL system number, F-rating, and installation date. Photographs of the labeled installations are compiled into a penetration log delivered at closeout — suitable for the authority having jurisdiction, a third-party special inspector, or the owner's barrier management records.
Our contract includes firestopping but it isn't our trade. Can it be subcontracted?
Yes. Drywall, electrical, mechanical, and plumbing contractors whose scopes include firestopping regularly engage Gateway as a lower-tier subcontractor. The trade contractor retains its contract with the general contractor; Gateway performs the firestop work and supplies the documentation required at closeout.
When is special inspection of firestopping required?
Under IBC Section 1705, penetration and joint firestop systems in high-rise buildings and Risk Category III/IV structures are subject to special inspection in accordance with ASTM E2174 and E2393. On those projects the inspector reviews installation records and system documentation — one of the reasons complete labeling and logs are part of Gateway's standard scope rather than an add-on.
How quickly can repair work be scheduled?
Repair scopes in the Omaha metro are typically scheduled within two business days of contact, and completed within two to five business days depending on scope. Where a re-inspection date is already set, scheduling is coordinated to precede it.

Service area

Omaha metro and eastern Nebraska

Based in Omaha, working throughout the metro and the surrounding region. Package work is considered across eastern Nebraska and western Iowa.

OmahaPapillionLa Vista BellevueElkhornGretna Council BluffsBlairFremont Lincoln

Qualifications

Registration & training

  • Registered contractor — Nebraska Dept. of Labor & City of Omaha
  • Commercial general liability insurance
  • Manufacturer installation training — STI & Hilti
  • OSHA 10 — Construction

Contact

Proposals, bid invitations, and repair scheduling

(531) 201-7007
Email
info@gatewayfirestop.com
Bid invitations
By email or through BuildingConnected. W-9 and certificates of insurance, including additional-insured endorsements, are returned the same business day.
Repair scopes
A photo of the flagged condition and the job address by text is enough to start. Typical scheduling is within two business days.
Hours
Monday–Friday, 6:00a–5:00p

Request a proposal

Call, text, or email — responses are sent within one business day.

Useful to include: project name or address, approximate penetration count or scope, and any schedule constraint such as a re-inspection or occupancy date. Plans and photos welcome.

Call Text